The primary function of bill of quantities

The primary function of bill of quantities
Bill of quantities need to provide a source of data for quantity surveyors to estimating 

Collect to the data for feedback of information for the contractor

To serve as a contract document  -  because this sets a standard of verbal precision and quantitative reliability without which none of the other functions would have a satisfactory basis.
To provide a basis for tendering - because most contract  are placed as a result or  competitive tendering, and a bill common to all tenders  esures comparability of tenders and is more economical of time and effort (both of which, ultimately, have to be paid for by employer).
To provide basis for interim certificate,
Necessary to a basis for valuing variations – these two being direct extensions of the contractual functions of bill of quantities which come into action post contract.


To serve the contractor in the organization of his work

To facilitate financial control by the employer

Cost Engineering and Quantity Surveying


Cost Engineering and Quantity Surveying have similar and highly overlapping functions. Quantity Surveying relates more to building design and construction, while Cost Engineering relates more to engineering projects and processes. However Cost Engineers and Quantity Surveyors commonly work in both areas. Cost Engineering and Quantity Surveying differ primarily in the route taken to professional qualification, not to any substantive difference in the two professions. Project Management overlaps both Quantity Surveying and Cost Engineering in the project cost management area to some degree but most Project Management functions are quite different from those of Cost Engineering and Quantity Surveying.


The following document summarizes the conclusions of discussions held at ICEC International Congresses and endeavors to compare the similarities and differences between the three professions, in terms of cost management matters only. A definition of entire scope of Project Management activity is not intended, nor should it be inferred, from this document. 


Cost Engineering (CE) and Quantity Surveying (QS)
Functions.

To provide independent, objective, accurate, and reliable capital and operating cost assessments usable for investment funding and project control.

To analyze investment and development for the guidance of owners, financiers and contractors.

CE and QS include:
  • - estimates of capital or asset costs including development costs;
  • - estimates of operating and manufacturing costs through an asset's life cycle;
  • - risk assessment and analysis;
  • - trending of scope and cost changes;
  • - decision analysis;
  • - financial analysis (eg, net present value, rate of return, etc);
  • - project cost control;
  • - appraisals of existing assets;
  • - project analyses, databases, and benchmarking;
  • - planning and scheduling;
  • - siting studies, etc.;
  • - productive and investment needs assessment;
  • - facility management needs assessment;
  • - project feasibility and budget assessment; 
  • - cost management;
  • - procurement management;
  • - contract administration;
  • - whole-life appraisals;
  • - quality audits;
  • - value management;
  • - dispute resolution.



These are typical functions of the CE or QS but not all practitioners in the field perform all of these functions. Many specialize in a limited number of these functions.


The CE or QS provides information by:

  •  estimating costs and analyzing risk,
  • - trending and controlling costs and assessing design, and
  • - documenting costs.



These are interdependent and feed back to each other. They include:

  • - analyzing cost,
  • - assessing design,
  • - assessing risks,
  • - trending costs,
  • - advising clients,
  • - managing cash flows,
  • - preparing feasibility analyses, and
  • - assessing life-cycle costs.